Complete Estimation Costing Of G2 Hostel Building Bbs

Quantity Surveying,Manual Quantity Take off For Steel, Concrete, Bricks,Cement, shuttering ,B.O.Q, Excel , Bar Bending

Last updated 2022-01-10 | 4.4

- Quantity Survey
- Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
- Able to take Entry level Jobs As a Quantity Surveyor & Estimator
- Bar Bending Schedule Of Footing
- Column
- Beam & Slab (Foundation To Roof Level)

What you'll learn

Quantity Survey
Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
Able to take Entry level Jobs As a Quantity Surveyor & Estimator
Bar Bending Schedule Of Footing
Column
Beam & Slab (Foundation To Roof Level)
Preparing Boq For Pcc
Excavation
Plastering
Concreting
Tmt Steel Etc
Basic Rate Analysis For Various Items ( PCC
RCC & SHUTTERING )
Quantity Estimation For Sump Tank & Flag Pole Foundation
Thumb Rules For Quick Calculations Of Shuttering Materials
Concreting
Centering
Plyboard & Props Required
Excel Basic Commands And How To Prepare & Use Excel Sheets For Quick Calculations
Case Studies Of 5bhk House With Interiors Estimation
Become a Quantity Estimator & Estimate Any Building Like Professional
Estimate any Building or House Plans with Quick thumb Rules
Quantity Estimation Of Brickwork
Blockwork
Plastering
Painting
Electrical Tiling Etc

* Requirements

* PATIENCE TO LEARN

Description

  • Quantity Survey, Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
  • Able to take Entry level Jobs As a Quantity Surveyor & Estimator
  • Bar Bending Schedule Of Footing, Column, Beam & Slab (Foundation To Roof Level)
  • Preparing Boq For Pcc, Excavation, Plastering, Concreting, Tmt Steel Etc
  • Basic Rate Analysis For Various Items ( PCC, RCC & SHUTTERING )
  • Quantity Estimation For Sump Tank & Flag Pole Foundation
  • Thumb Rules For Quick Calculations Of Shuttering Materials, Concreting , Centering, Plyboard & Props Required
  • Excel Basic Commands And How To Prepare & Use Excel Sheets For Quick Calculations
  • Case Studies Of 5bhk House With Interiors Estimation
  • Become a Quantity Estimator & Estimate Any Building Like Professional
  • Estimate any Building or House Plans with Quick thumb Rules
  • Quantity Estimation Of Brickwork, Blockwork, Plastering, Painting, Electrical Tiling Etc

Course content

17 sections • 166 lectures

General Introduction of the Course Preview 06:03

Calculate Excavation Quantity Preview 19:34

Calculate Sand Filling Quantity Preview 04:49

Calculate PCC ( Lean Concrete) Quantity Preview 03:38

Formwork Quantity for Isolated Footing ( Explained with Live Photos ) Preview 06:11

Calculate Footing Concete Quantity ( Live Photos Shown ) Preview 03:18

Formwork Quantity for Neck Column / Pedestal ( Highly Imformative ) Preview 19:33

Cross checking Of Column Numbers with Footing Numbers for Accurate Calculation Preview 01:20

Calculate Column Concrete Upto Plinth Beam Bottom / Neck Column ( Site Photo) Preview 04:07

Backfilling Quantity , Tipper Trucks Required & Thumb Rule for Backfilling Preview 06:29

Plinth Beam PCC Quantity Estimation & Learn to Understand Industrial Drawings Preview 19:05

Plinth Beam Formwork Quantity Calculation ( Highly Informative + All do Mistake) Preview 14:55

Case Study when secondary Beam Intersect Primary Beam ( Calculate Formwork ) Preview 04:10

Calculate Plinth Beam Concrete Quantity Preview 09:03

Calculate Column Height Till 1st floor/ Roof Bottom Level (Highly Informative) Preview 11:46

Column Shuttering Calculation Till 1st floor Beam Bottom / Roof Beam Bottom Preview 13:31

Column Concrete Calculation Till 1st floor Beam Bottom/ Roof Beam Bottom Level Preview 04:36

Calculate Extra Quantity of Column Shuttering & Concrete ( Missing Quantity) Preview 11:53

Roof Beam & Slab Layout Drawing & Real Site Photos & videos ( Must Watch ) Preview 05:35

Roof Beam Bottom , Outside & Inside Shuttering Calculations Preview 10:46

Shortcut Method for Quick Calculation of Beam Shuttering Preview 06:02

Shortcut Method 2 Preview 06:27

Calculate Beam Inside Shuttering when both the side slab is Present Preview 05:43

Vertical Roof Beam Shuttering Preview 05:05

Beam Inside Shuttering calculation when 2 slab Intersects ( Case Study ) Preview 08:37

Calculate Roof Beam Concreting Quantity Preview 08:12

Calculate Roof Slab Centering Quantities Preview 10:58

Calculate Roof Slab Concrete Quantities Preview 06:35

Details of Assignment Plan for Practice Preview 01:53

Combined Footing Assignment Solution for Finding depth Of Excavation Preview 04:07

Assignment Solution for Plith Beam PCC Preview 07:52

Assignment Solution For Plinth Beam Shuttering Calculation ( Must Watch) Preview 05:55

Oveview of G+2 Hostel Building with all Drawings Preview 06:22

Excavation Quantity Preview 11:06

Calculate Rubble soling Quantity ( Specially for Weak Soil ) Preview 03:43

Sand Filling Quantity Preview 01:06

PCC Quantitiy & Material Price Calculation for Total Pcc of Hostel Buildiing Preview 16:19

How to Calculate water Required for 1 bag of cement Preview 02:52

Footing Shuttering Quantity & Material calculatiom for all Footings Preview 02:43

Concrete Quantity for footing & Material calculation for concrete (M-20 1:1.5:3) Preview 05:27

Column Shuttering & column Height calculation till Plinth Beam Bottom Preview 10:12

Calculate Circular Column Shuttering Quantity ( Must Watch ) Preview 02:33

Calculate Circular Column Concrete Quantity ( Live Photos Shown ) Preview 05:14

Calculate Backfilling Quantity of Soil Preview 03:19

Plinth Beam PCC Quantity & Drawing Column Grid Lines Manually Preview 13:00

Plinth Beam PCC Complicated Beams ( Case Study ) Preview 08:02

Plinth Beam Shuttering Quantity ( When 2 Secondary Beam Intersects one Beam ) Preview 05:55

Plinth Beam Concrete Quantity Preview 03:24

Missing Quantities upto Plinth Beam Top ( Shuttering & Concreting ) Preview 05:45

Ground Floor Column Shuttering Height calculation with Beam depth Deduction Preview 09:01

Calculate Ground Floor column concrete for circular column Preview 02:44

Ground Floor Beam Shuttering Quantities Preview 06:38

Beams Near Staircase & Beams Near Cutout Portion & Circular Beams Calculation Preview 10:36

Calculation of Beam Inside shuttering Having Secondary ( Must watch) Preview 09:44

Ground floor Beam Concrete Calculation Preview 02:55

Slab Centering Quantity Calculation Preview 06:59

Ground Floor Slab Concreting & Complete Estimation Preview 05:27

Ground Floor Missing Quantities ( Column Shuttering & Concreting ) Preview 05:05

Shortcut Method to Find Column Shuttering & Concrete Quantitiy Preview 04:57

Total G+2 Slab Construction Material Cost Preview 02:13

Masonary wall Calculation Manual for 35m2 Room ( Bricks, Cement , sand & water ) Preview 18:43

Brickwork Calculation using Excel Sheets ( Quick Answers ) Preview 05:10

MISSING PART OF LECTURE 61 Preview 01:18

Inside Wall Plastering Manual Method ( Cement ,Sand & Water calculation) Preview 05:55

Inside Wall Plastering Estimation & Costing ( Excel Sheet ) Preview 04:20

Inside Wall Plastering when Door Jambs are Placed outside( Case Study ) Preview 04:52

Wall Putty & Gypsum POP Punning Calculations Preview 04:35

Wall Putty & Gypsum Punnning calculation ( Excel Sheet ) Preview 02:08

Wall Painting Calculation Manual & Excel sheet Preview 01:47

Ceiling Putty Manual & Excel Sheet Calculation Preview 02:00

Ceiling Plastering & Painting Manual & Excel Sheet calculations Preview 02:42

Tiles Number & Skirting calculation Manual & Excel Preview 04:12

Electrical Fixtures & Wiring Estimation Preview 04:34

Brick Work calculation For 2nd Room Preview 05:45

Plastering Calculation with Column Offset ( Case study ) Preview 04:46

Wall Putty, Plastering & Painting Calculations ( Excel +Manual ) Preview 01:20

Ceiling putty , Plastering & Paint calculation ( Case Study with Beam in Slab ) Preview 04:10

Tiles & Skirting Quanitity Case Study ( Excel+ Manual ) Preview 04:22

External Wall Plastering + Painting + Parapet + WallPaper Calculation Preview 10:25

FULL VIDEO OF G+2 HOSTEL BUILDING ( CONCRETE + SLAB + BRICKWORK + CENTERING ) Preview 08:39

WHAT IS RISER, THREAD AND WAIST SLAB & HOW TO FIND ITS HEIGHT Preview 14:09

WAIST SLAB CONCRETE , CENTERING & SHUTTERING CALCULATION ( MANUAL + EXCEL ) Preview 06:48

LANDING SLAB CONCRETE, CENTERING & SIDE SHUTTERING ( MANUAL +EXCEL ) Preview 05:29

CALCULATE STEPS CONCRETE QUANTITY & SHUTTERING QUANTITY ( MANUAL + EXCEL ) Preview 08:15

COMPLETE COST OF STAIRCASE CONCRETING & SHUTTERING ( G+2 BUILDING ) Preview 04:36

CENTERING FOR FLOOR SLAB & STAIRCASE SHUTTERING Preview 06:39

UNDERSTANDING OF STRUCTURAL DRAWINGS & COVER BLOCK IMPORTANCE Preview 10:11

BBS OF FOOTING MANUALLY ( WHITE BOARD ) Preview 10:37

DIFFFERENCE IN CUTTING LENGTH CALCULATION FOR QUANTITIY SURVEYOR & BAR BENDER Preview 11:15

BBS of FOOTING ALONG SHORTER SPAN ( EXCEL CALCULATION ) Preview 15:35

BBS OF FOOTING ALONG LONGER SPAN ( EXCEL + MANUAL Preview 06:48

TOTAL FOOTING STEEL REQUIRED FOR G+2 HOSTEL BUILDING Preview 02:24

HOW TO CALCULATE "L" FOR FOOTING IN EXCEL ( CASE STUDY ) Preview 01:57

BBS FOR COMBINED FOOTING ( MANUAL +EXCEL) Preview 10:30

UNDERSTANDING OF COLUMN REINFORCEMENT DRAWINGS & CALCULATIONS Preview 12:46

HOW TO CALCULATE CUTTING LENGTH OF COLUMN MAIN BAR Preview 10:01

CUTTING LENGTH OF 2 DIFFERENT DIAMETER BAR IN COLUMN ( EXCEL CALCULATION ) Preview 07:08

LEARN TO READ COLUMN LATERAL TIES DRAWINGS & TYPES OF LATERAL TIES Preview 09:25

CALCULATE COLUMN MASTER RING ( LATERAL TIES ) CUTTING LENGTH Preview 13:01

PRACTICAL VIDEO OF LATERAL TIES/ STIRUPPS CUTTING LENGTH Preview 03:01

VIDEO OF CUTTING LENGTH OF STIRRUPS Preview 01:12

CALCULATE CUTTING LENGTH OF INNER RING / LATERAL TIES ( MANUAL+EXCEL ) Preview 12:08

CALCULATE CUTTING LENGTH OF LINKS ( MANUAL +EXCEL) Preview 06:01

CUTTING LENGTH OF CIRCULAR COLUMN & CIRCULAR TIES Preview 05:30

COMPLETE BBS OF COLUMN WITH ALL CALCULATION ( MANUAL+EXCEL )-ESTIMATION OF STEEL Preview 15:17

WHAT IS LAP LENGTH & HOW TO CALCULATE IT Preview 06:36

CUTTING LENGTH OF COLUMN BAR TILL ROOF ( MANUAL + EXCEL ) Preview 06:16

COMPLETE FLOOR LATERAL TIES CALCULATIONS ( MANUAL +EXCEL ) Preview 07:41

COMPLETE COST OF G+2 BUILDING FOR STEEL ALONE (MANUAL+EXCEL) Preview 03:04

CUTTING LENGTH OF BEAM TOP BAR ( MANUAL +EXCEL) Preview 14:01

CUTTING LENGTH OF BEAM BOTTOM BAR ( PRATICAL VIDEO OF BBS ) Preview 03:10

CALCULATE CUTTING LENGTH OF STIRRUPS ( MANUAL +EXCEL) Preview 06:06

CUTTING LENGTH OF STIRRUPS FOR 3 DIFFERENT SPACING FROM STRUCTURAL DRAWING Preview 08:13

BBS WITHIN 30 SECONDS ( QUICK EXCEL SHORTCUTS ) Preview 04:43

CALCULATE CUTTING LENGTH OF TOP EXTRA BAR ( PRACTICAL VIDEO + THEORY EXPLAINED ) Preview 13:32

CUTTING LENGTH FOR TOP RIGHT EXTRA BAR Preview 02:21

CALCULATE BOTTOM CURTAIL BAR IN BEAM ( MANUAL+EXCEL) Preview 04:16

COMPLETE BBS OF BEAM MANUAL + EXCEL ( TOP, BOTTOM, EXTRA, CURTAIL & STIRRUPS) Preview 07:16

HOW TO PREPARE EXCEL SHEET & CALCULATING LENGTH FOR DIFFERNT BEAM ( CASE STUDY ) Preview 15:40

BBS FOR SIDE FACE RIENFORCEMENT BEAM ( DRAWING + EXCEL ) Preview 15:31

SLAB BBS DRAWING & FINDING CUTTING LENGTH OF BAR ( MANUAL + PPT) Preview 14:10

NUMBER OF BARS ALONG SHORTER & DISTRIBUTION BAR CALCULATION ( MANUAL ) Preview 07:02

CUTTING LENGTH OF ONE WAY SLAB WITH EXCEL Preview 05:27

UNDERSTANDING THE BAR BENDING FOR CONTINOUS SLAB ( MANUAL + PPT+ LIVE PHOTOS) Preview 10:40

CALCULATE CUTTING LENGTH OF CONTINOUS SLAB ( MANUAL + PPT ) Preview 10:20

CALCULATE CUTTING LENGTH OF CONTINOUS SLAB ( EXCEL ) Preview 13:17

CALCULATE CUTTING LENGTH OF TOP EXTRA BAR ( MANUAL + EXCEL) Preview 14:41

TOP EXTRA BAR ( EXCEL CALCULATION ) Preview 02:35

CUTTING LENGTH OF CRANK DISTRIBUTOR BAR ( MANUAL + PPT ) Preview 12:20

WHAT IS CHAIR ROD, IMPORTANCE OF CHAIR & CALCULATE CUTTING LENGTH OF CHAIR ROD Preview 13:11

COMPLETE SLAB BAR BENDING THROUGH PRESENTATION ( TOP EXTRA & ALTERNATE CRANK ) Preview 08:29

MANUAL CALCULATION OF ONE WAY CONTINOUS SLAB Preview 30:44

BBS FOR 2 WAY SLAB Preview 09:16

IMPORTANCE OF L/5 & L/ 4 , HOW TO USE IT & UNDERSTANDING DIFFERENT TYPES OF SLAB Preview 11:41

BOQ FOR EXCAVATION & BACKFILLING OF SOIL Preview 08:36

HOW TO PREPARE BOQ FOR PCC & CONCRETE ( M-20) Preview 08:00

BOQ FOR CENTERING & SHUTTERING WORKS ( FOOTING ,BEAM, COLUMN, SLAB & STAIRCASES) Preview 10:59

BOQ FOR TMT BARS Preview 03:37

BOQ FOR PLASTERING, PAINITING, BRICKWORKS, FLOORING , TILING ETC Preview 05:06

UNDERSTANDING OF RATE ANALYSIS & HOW TO USE IT IN BOQ Preview 09:05

Rate Analysis for PCC Preview 14:16

Rate Analysis for RCC Preview 09:04

Rate Analysis for BRICKWORK Preview 13:42

Rate Analysis for Half BrickWork ( 4.5Inch ) Preview 10:31

Rate Analysis for Blockwork Preview 10:32

Rate Analysis for Inside Wall Plastering Preview 03:38

Rate Analysis for Ceiling Plastering Preview 04:08

Rate Analysis for Tiling Works Preview 05:54

Rate Analysis for Steel Work / Reinforcement work Preview 04:58

Estimation Of Undeground Water Tank ( 150 KL) Preview 09:41

Estimation of UG Tank SLab & Total Material Cost ( Excel Commands Explained ) Preview 04:43

Flag Pole Foundation Quantity Estimation & Costing (Advance Excel Calculations) Preview 10:24

ESTIMATION & PREPARING BOQ FOR CALCIUM CEILING, EXHAUST GRILL & GYPSUM CEILING Preview 08:15

CALCULATE WALL TILES, FLOOR DRAIN, WASH BASINS, URINALS ETC Preview 04:13

CALCULATE LINTEL, SILL, CHAJJA, CANTILEVER SLAB & DIFFERENT STRCUTURAL DRAWINGS Preview 07:47

CALCULATE CUTTING LENGTH OF LINTEL & SILL CONCRETE Preview 08:21

CALCULATE HOW MUCH CEMENT BLOCKWORK REQUIRED FOR 1 M2 AREA Preview 05:13

THUMB RUL,ES FOR CALCULATIONS OF CEMENT, SAND , STEEL & AGGREGATE Preview 02:07

THUMB RULES VERIFICATION FOR G+2 HOSTEL BUILDING ESTIMATION ( VERY HELPFUL ) Preview 05:10

CALCULATE CONCRETE REQUIRED WITH HELP OF AREA OF BUILDING ( THUMB RULE ) Preview 06:34

CALCULATE SHUTTERING PLYBOARDS, NAILS, BINDIING WIRE & SHUTTERING OIL QUANTITY Preview 05:08

THUMB RULE TO FIND BEAM BOTTOM & BEAM SHUTTERING FROM SLAB AREA Preview 05:53

THUMB RULE TO FIND SLAB CENTERING PLATES( 2' X 3 ' MILD STEEL PLATES ) Preview 03:38

CALCULATE PROPS & BATTENS REQUIRED FOR BEAMS & SLABS Preview 08:38